NZTA - Latest News [Page 48]
Expect delays on SH2 near Te Puna this weekend
Friday, 20 July 2018, 2:30 pm | NZTA
The NZ Transport Agency advises road users they can expect delays on State Highway 2 between Omokoroa Road and Esdaile Road this Saturday 21st and Sunday 22nd July between 7am and 5pm while tree felling & maintenance work is carried out. More >>
Repair work on SH2 Takitimu Drive side of Waikareao pathway
Friday, 20 July 2018, 9:33 am | NZTA
The NZ Transport Agency advises repair work will begin on the Takitimu Drive side of the Waikareao Estuary pathway on Monday 23rd of July at 9am. More >>
Planned closure for State Highway 1 north of Kaikōura
Wednesday, 18 July 2018, 4:50 pm | NZTA
Planned three day, daytime closure for State Highway 1 north of Kaikōura - early August In order to stabilise a rock face north of Kaikōura at Ōhau Point, the NZ Transport Agency has scheduled a three day, daytime closure from Monday, 6 August ... More >>
EVRoam provides safe, reliable information for EV charging
Wednesday, 18 July 2018, 3:16 pm | NZTA
EVRoam, a real-time database of public charging infrastructure launched by Associate Minister of Transport Hon Julie Anne Genter today, provides one view of a safe, reliable and interoperable public charging network for electric vehicles in New Zealand. The ... More >>
Tree clearance starts on Lewis Pass highway
Tuesday, 17 July 2018, 12:01 pm | NZTA
In preparation for a $2 million realignment of the South Island’s Lewis Pass highway (SH7), Transport Agency crews will be clearing a stand of trees this week. The road construction work will take place over the 2018/19 summer roadwork season. More >>
Luggate (Red) Bridge Repair Works
Tuesday, 17 July 2018, 9:36 am | NZTA
People who use the road between Wanaka and Tarras, State Highway 8A, may experience some disruptions, starting this week and going into next week. More >>
UPDATE: State Highway 2 Waioeka Gorge planned to re-open
Monday, 16 July 2018, 6:41 pm | NZTA
UPDATE: State Highway 2 Waioeka Gorge planned to re-open 24/7 later this week More >>
Speed limit changes around the Waterview Tunnel
Monday, 16 July 2018, 9:57 am | NZTA
Maximum speed limits on parts of state highways around the Waterview Tunnel are changing next week. More >>
Waioeka Gorge closure due to weather conditions
Sunday, 15 July 2018, 2:30 pm | NZTA
The NZ Transport Agency is asking motorists to stay up to date with road conditions between Opotiki and Gisborne (SH2) as severe weather may mean the Waioeka Gorge will close today at 3pm as a safety precaution. More >>
State Highway 11 at Lemons Hill reduced to one lane
Friday, 13 July 2018, 4:44 pm | NZTA
The NZ Transport Agency advises Northland motorists that State Highway 11 past Lemons Hill will be reduced to one lane traffic during the daytime next week. More >>
SH29A Maungatapu roundabout trial
Friday, 13 July 2018, 1:33 pm | NZTA
The NZ Transport Agency advises that from Thursday 19 July 2018 a 10-day trial will be carried out for people using SH29A travelling to the city from Te Maunga/Baypark via the Maungatapu roundabout. More >>
Upper Buller Gorge – highway likely to continue to be closed
Tuesday, 10 July 2018, 1:56 pm | NZTA
Update on Upper Buller Gorge – highway likely to continue to be closed most of today More >>
Dunedin to Mosgiel barriers installed
Tuesday, 10 July 2018, 9:54 am | NZTA
A $5.4 million project to make State Highway 1 between Dunedin and Mosgiel safer is almost complete, says the NZ Transport Agency. More >>
Update – Waioeka Gorge to remain closed
Monday, 9 July 2018, 7:48 pm | NZTA
The NZ Transport Agency is urging motorists to stay up to date with road conditions between Opotiki and More >>
Update 5pm: SH6 closure near Iron Bridge, Upper Buller Gorge
Monday, 9 July 2018, 4:56 pm | NZTA
Update 5pm: SH6 closure near Iron Bridge, Upper Buller Gorge – remaining closed overnight State Highway 6 through the Upper Buller Gorge between Murchison and the Iron Bridge at Inangahua will remain closed overnight due to rockfall concerns, says ... More >>
Upper Buller Gorge, SH6, slips, closures
Monday, 9 July 2018, 10:14 am | NZTA
Upper Buller Gorge, SH6, slips, closures due to heavy rain over weekend/ Sunday 8 July More >>
Slow down through Baypark to Bayfair Link project
Monday, 9 July 2018, 10:12 am | NZTA
The NZ Transport Agency is reminding drivers there is a temporary 50km/h speed restriction in place through the Baypark to Bayfair Link (Bay Link) construction site. More >>
State Highway 2 Bethlehem Bay of Plenty is closed
Saturday, 7 July 2018, 3:04 pm | NZTA
State Highway 2 Bethlehem Bay of Plenty is closed until further notice due to a serious crash More >>
Weather conditions to close Gisborne – Opotiki
Friday, 6 July 2018, 4:46 pm | NZTA
The NZ Transport Agency is urging motorists to stay up to date with road conditions between Opotiki and Gisborne (SH2) this weekend as heavy rain in the forecast will likely require the closure of the road through the Waioeka Gorge as a safety precaution. ... More >>
August three day, daytime closure SH 1 north of Kaikōura
Friday, 6 July 2018, 3:42 pm | NZTA
Planned three day, daytime closure for State Highway 1 north of Kaikōura - early August More >>
